Thanks be to God, March was a busy month! We received another $50,000 matching grant from Catholic Extension!
Here is a brief recap:
- Installed Large Curved Beams Inside Church
- Began Work on HVAC and Electric
- Wood Recevied Preventative Treatment for Termites
- Received Right-of-Way Permit
- Multiple Inspections Passed for Retaining Walls
- Removed Wall Seperating Narthex and Nave
- Second Tranche of Loan Funded
Schedule for April:
- Framing of Central Dome Structure
- Window Installation
- Finish HVAC, Electrical, and Plumbing (MEP) Systems
- Site Work on Biofiltration Basin, Retaining Walls, Grading, Soil Export, and Parking Lot
- Construction of Both Driveways
We’ll let the pictures tell the rest of the story. Glory be to God! Слава Богу за все!